6月30日,備受矚目的深中通道將迎來通車,在這個超級工程的各項建設(shè)中,中山供電局建設(shè)完成的各項電力工程,為項目運營提供了強勁的電力支撐。到底中山電力是如何保證深中通道全線“不停電”的?跟著中山+主持人,一起來了解一下。
On June 30, the?highly anticipated?ShenZhong Link will be open to traffic. In the construction of this mega?project,?the power projects?completed by the Zhongshan Power Supply Bureau?have provided?strong power support for the operation of the project. How has?Zhongshan Power Supply Bureau?ensured?the “uninterrupted power supply”?for?the ShenZhong?Link??Let’s find out together?with the anchor of Zhongshan Plus.
【出品】中山市海外傳播中心
【策劃/編導】謝瓊
【視頻攝制】黃藝杰
【出鏡主持】羅楊鴻
【翻譯/校對】甘穎?饒梅芳
【設(shè)計】蔡文強
【攝像助理】鄭志珊 馮淋
【通訊員】馬冠華 李紅梅
編輯? 甘穎? ?二審? 謝瓊? 三審 ? 岳才瑛
